{"company":{"name":"Varseline Industries SRL","enterprise_number":"0930.701.043","vat_number":"BE0930701043","address":"Rue des Forges 18","postal_code":"4000","commune":"Liège","rpm_court":"Liège, division Liège","email":"qualite@varseline-industries.example"},"supplier":{"name":"Kervalisse Metaal BV","enterprise_number":"0930.703.122","address":"Industrielaan 12, 3500 Hasselt"},"audit":{"reference":"AUD-2026-004","type":"on_site","date":"2026-09-24","location":"Site de Kervalisse Metaal BV, Hasselt"},"auditors":[{"name":"Sabrina Delcourt","role":"Responsable qualité, auditrice principale"},{"name":"Julien Wauters","role":"Responsable des achats"}],"supplier_representatives":[{"name":"Pieter Claessens","role":"Directeur de production"},{"name":"Els Maes","role":"Responsable qualité"}],"scope":{"processes":["Réception des matières","Contrôle final","Traçabilité des lots"],"sites":["Atelier d'usinage de Hasselt"],"standards":["Clauses qualité du contrat d'approvisionnement"]},"methodology":"Entretiens avec la direction et le service qualité, visite de l'atelier et examen par sondage de dossiers de lots livrés à Varseline Industries au premier semestre 2026.","summary":"Le fournisseur maîtrise ses processus d'usinage ; la traçabilité des lots et le contrôle final doivent être mieux documentés.","findings":[{"id":"C1","origin":"this_audit","area":"Contrôle final","description":"Les mesures du contrôle final ne sont pas enregistrées pour tous les lots.","severity":"major","evidence":"Trois dossiers de lots sur dix sans relevé de mesures","recommendation":"Enregistrer les mesures de chaque lot","owner":"Responsable qualité","target_date":"2026-10-31","status":"open"},{"id":"C2","origin":"this_audit","area":"Traçabilité","description":"Le certificat matière n'est pas archivé avec le dossier de lot.","severity":"minor","evidence":"Deux certificats retrouvés dans un autre classeur","recommendation":"Archiver le certificat dans le dossier de lot","owner":"Responsable qualité","target_date":"2026-11-15","status":"open"},{"id":"C3","origin":"this_audit","area":"Réception des matières","description":"L'étiquetage des matières en attente de contrôle est incomplet.","severity":"minor","recommendation":"Compléter l'étiquetage des zones de quarantaine","owner":"Responsable logistique","target_date":"2026-10-31","status":"in_progress"}],"overall_conclusion":"conditional_pass","cap_due_date":"2026-10-24","supplier_comments":"Le fournisseur reconnaît les constats C1 et C2 et s'engage à proposer son plan d'actions dans le délai demandé.","follow_up_audit_planned":"2027-03-15","signatory":{"name":"Sabrina Delcourt","title":"Responsable qualité","date":"2026-09-30"}}